On August 19th, 2014, on behalf of our group, Xiangxiang Chen presented the final achievements on the collaborated project "BIM-Based Factorial Construction (Design, Processing, Storage) Management System" to representatives from the First Engineering Co., Ltd. Of the China Construction Third Bureau along with a system demonstration. The project started in April, 2013 and finished 15 months since then. Liang Wang, chief engineer from the Installation Branch, highly remarked the final research accomplishments and expressed his intention for future cooperation.